DOMESTIC

REACTIVE BLOCKAGE CLEARANCE

The Problem: Blockages were reported in the toilet and kitchen sink pipework.

The Course of Action: Engineers attended site to investigate and clear the blockages.

Work Undertaken: Sink: small bore electro-mechanical machine works carried out to clear waste pipework from sink to external waste gully.
Toilet: Medium bore electro-mechanical machine was used from the toilet pan downstream to the manhole connection.

The Outcome: Blockages were all cleared and the system restored to 100% working operation.

Job Length: 2 day

Products Used:

  • External Waste Pipe
  • External Waste Gully
  • Small Bore Electro-Mechanical Machine
TOP